Download this Checklist as a PDF
Epoxy / Flake / Urethane
Materials checklist:
Epoxy – ICE 100 or ICE 100 Low Temp.
Qty of 100sqft/gallon (ex. 6 gallons for 600 sqft)
Urethane – ICU 245
Coat 1: Qty of 250 sqft/gallon (375sqft per kit as each kit is 1 1/2 gallons) for first coat.
Coat 2: Qty of 350 sqft/gallon (525 sqft per kit) for second coat.
Flakes: Coverage rate: Use .08 to .1 lbs./sqft (ex. 600 sqft = 48 – 60 lbs.)
Blower
Wire brushes
Crack Filler
Drill, Jiffy Mixer, & an extension cord.
Gauge rake (or flat edge w/pole to spread out epoxy)
Cut-in brushes (3” “Chip” brushes)
Tape: Green, blue & Duct tape (with plastic – see process)
Nitrile gloves
Rollers, extending poles (~ 6ft)
Roller heads – 3/8” Nap with solvent resistant core (qty. of 1 per roller per coat)
Spiked shoes
Masks – with charcoal filters
Clean 5 gallon buckets for epoxy, chips & Urethane
Grinding equipment – with industrial concrete vacuums (can rent).
Hand Sanitizer – Nothing cleans un-cured epoxy off better than hand sanitizer.
Scrapers (flat edge with poles to scrape flakes before urethane)
Clean rags
Razor knife, Shop – Vac (recommend Ridgid)